How the quantities are worked out
Multiply the finished volume by the dry volume factor, then split the result by the ratio.
Cement = finished volume × 1.54 × cement parts ÷ total parts
A 94 pound bag of Portland cement is one cubic foot.
A worked example
One cubic yard of concrete is 27 cubic feet. Times 1.54 is 41.6 cubic feet of dry materials. At 1 to 2 to 3 there are six parts, so the cement is 6.9 cubic feet, which is 7 bags. The sand is 13.9 cubic feet and the gravel 20.8.
Good to know
- Measure by the bucket, levelled off, so every batch is the same.
- Add water a little at a time. The mix should hold its shape when squeezed. Too much water is the commonest cause of weak, cracked concrete.
- For anything structural, such as footings and foundations, use ready-mix ordered to the strength on your plans, or bagged mix rated for it.
- For mortar, set the gravel to 0. A common mix is 1 part cement to 3 of sand, and the dry factor for mortar is about 1.33.
Common questions
Is it cheaper than bagged concrete mix?
For large amounts, usually. For small jobs, premixed bags save the trouble of buying, storing and measuring three materials.
How we know this calculator is right
Before this calculator went on the site, 12 answers were worked out separately from its code, by hand or straight from the formula above. Each time this page loads, your own browser runs the calculator on those same numbers and compares. Turn on JavaScript to see the comparison.
See every check
| Numbers used | Result | Worked out separately | This calculator |
|---|
What this proves: the calculator does the arithmetic of the formula shown, correctly. What it cannot prove: your measurements, or figures such as coverage per bag, waste and spacing, which are typical starting values you can change. Go by the product label and your local code.